Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 13 of 13 for “"contract administration"”.

  1. Contract administration of Department of Defense environmental resoration contracts

    Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1992.

    mit Repository record for Contract administration of Department of Defense environmental resoration contracts (opens in a new tab)

  2. A case study of Magnavox as a model for Process Oriented Contract Administration Services (PROCAS) implementation

    … the implementation of the Process Oriented Contract Administration Services (PROCAS) program at Magnavox Electronic Systems Company in Fort Wayne, Indiana, one of the seven pilot sites for the program. PROCAS is a Defense Contract Management Command (DCMC) initiative designed to apply the …

    nps Repository record for A case study of Magnavox as a model for Process Oriented Contract Administration Services (PROCAS) implementation (opens in a new tab)

  3. STRATEGIC INTEGRATION, CONTRACT ADMINISTRATION, AND COMPREHENSIVE CONTRACT CAMPAIGN EFFECTIVENESS: A CASE STUDY OF THE CULINARY WORKERS UNION, HERE LOCAL 226'S 2002 COMPREHENSIVE CONTRACT CAMPAIGN

    … This thesis is a case study of the comprehensive contract campaign that the Culinary Union, HERE Local 226 utilized in its 2002 round of negotiations with casino operators in Las Vegas. The focus of this study is on how the comprehensive contract campaign strategy used by the Culinary Union …

    cornell Repository record for STRATEGIC INTEGRATION, CONTRACT ADMINISTRATION, AND COMPREHENSIVE CONTRACT CAMPAIGN EFFECTIVENESS: A CASE STUDY OF THE CULINARY WORKERS UNION, HERE LOCAL 226'S 2002 COMPREHENSIVE CONTRACT CAMPAIGN (opens in a new tab)

  4. Adequacy of Training of Iowa Principals for Administration of Negotiated Contracts

    … adequately trained to implement master contracts negotiated under this law? Procedure. Literature was reviewed to determine training needed for contract administration. Principals were interviewed concerning their administrative training and experience as well as their opinions on …

    drake Repository record for Adequacy of Training of Iowa Principals for Administration of Negotiated Contracts (opens in a new tab)

  5. An Investigation of Change to Key Provisions in the AIA A201 and its Impact on Perceptions of the Value-added Benefit of the Design Professional during Construction

    The general conditions of contract play a very important role in the dynamics of the construction phase. The general conditions of contract outline the roles, rights, and obligations of the contracting parties during the construction phase of a project. The American Institute of Architects General …

    vt Repository record for An Investigation of Change to Key Provisions in the AIA A201 and its Impact on Perceptions of the Value-added Benefit of the Design Professional during Construction (opens in a new tab)

  6. An evaluation of factors that influence service contract quality.

    … be undertaken. Today, both the Government and contractors are facing growing competitive and regulatory pressures to deliver higher quality services. In an attempt to comply with these pressures more emphasis has been placed on the inspection process and subsequently on the contract

    nps Repository record for An evaluation of factors that influence service contract quality. (opens in a new tab)

  7. AN ANALYSIS OF THE TAIWAN NAVY MINEHUNTER PROCUREMENT FRAUD CASE

    … Company was awarded a US $1.85 billion contract from the Taiwan Navy to build six minehunters; but, due to Ching-Fu’s loan syndication scandal and contract breach, the Taiwan Navy terminated the contract. This procurement failure hindered Taiwan’s indigenous defense shipbuilding goal and …

    nps Repository record for AN ANALYSIS OF THE TAIWAN NAVY MINEHUNTER PROCUREMENT FRAUD CASE (opens in a new tab)

  8. A leading indicator approach to safety: a case study of Nigeria’s construction sector

    … safety leading indicators into five categories: contract administration, project-based, prequalification, activities, and safety involvement. Thematic analysis of interview data provided in-depth insights into these indicators. Additionally, text mining helped identify the primary discussion …

    wlv Repository record for A leading indicator approach to safety: a case study of Nigeria’s construction sector (opens in a new tab)

  9. Conflict and claims culture in construction

    … on the subject. Incomplete design, ambiguous contract terms and poor contract administration remain common, causing contractors to routinely make claims for additional time and money. The settlement of claims is made more difficult by inadequate record-keeping, exaggerated claimed submissions …

    salford Repository record for Conflict and claims culture in construction (opens in a new tab)

  10. Stability of Embankments Founded on Soft Soil Improved with Deep-Mixing-Method Columns

    … with an unknown degree of conservatism and (2) contract administration problems resulting from unrealistic specifications for deep mixed materials. This dissertation describes research conducted to develop reliability-based design procedures for foundations constructed using the deep mixing …

    vt Repository record for Stability of Embankments Founded on Soft Soil Improved with Deep-Mixing-Method Columns (opens in a new tab)

  11. Continuous improvement CSF framework for assessing CI maturity in ISO and non-ISO certified construction contracting organizations

    … cost overruns, rework, variations, claims, poor contract administration and lax supervision by the client’s representative. Taking into account that construction projects are unique, temporary and embedded in sub-contracting culture, the task of achieving productivity improvement requires …

    uthm Repository record for Continuous improvement CSF framework for assessing CI maturity in ISO and non-ISO certified construction contracting organizations (opens in a new tab)