Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 1 of 1 for “"capital inventory requirement"”.

  1. Time-Based Manufacturing System Design for Softwood Lumber Production

    … time of 35.3 days according to six months of inventory data. Four future state systems were developed according to current demand and had lead times ranging from 10.8 to 14.9 days. Lead time reduction was achieved through more closely synchronizing and planing operations with sawmill output. …

    vt Repository record for Time-Based Manufacturing System Design for Softwood Lumber Production (opens in a new tab)