Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 2 of 2 for “"Set-up Time Reduction"”.
-
Lean Manufacturing: Setup Time Reduction in Secondary Wood Manufacturing Facilities in North America
… of this study is to investigate the success of set-up time reduction efforts (one of the steps needed to achieve 'one-piece flow') in secondary wood products manufacturing facilities on four woodworking machines (moulder, shaper, table saw, and band saw) based on firm size. The first objective …