Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 2 of 2 for “"Set-up Time Reduction"”.

  1. Lean Manufacturing: Setup Time Reduction in Secondary Wood Manufacturing Facilities in North America

    … of this study is to investigate the success of set-up time reduction efforts (one of the steps needed to achieve 'one-piece flow') in secondary wood products manufacturing facilities on four woodworking machines (moulder, shaper, table saw, and band saw) based on firm size. The first objective …

    vt Repository record for Lean Manufacturing: Setup Time Reduction in Secondary Wood Manufacturing Facilities in North America (opens in a new tab)