  1. Use of Team Building on Construction Projects to Reduce Cost Growth and Schedule Growth

    … provided the foundation for this research. Cost growth and schedule growth are two areas that were suspected to be improved by the use of team building. A thorough statistical and graphical analysis was conducted to evaluate the effects of the team building process on cost growth and schedule

    vt Repository record for Use of Team Building on Construction Projects to Reduce Cost Growth and Schedule Growth (opens in a new tab)

  2. Investigating the relationships of project performance measures with the use of Building Information Modeling (BIM) and Integrated Project Delivery (IPD)

    … IPD experienced significantly less cost and schedule growth; what's more, projects that used BIM in construction were found to exhibit significantly higher levels of schedule growth. Lastly, healthcare projects using IPD had significantly fewer Requests for Information (RFI) at the 90% CL. A …

    emich Repository record for Investigating the relationships of project performance measures with the use of Building Information Modeling (BIM) and Integrated Project Delivery (IPD) (opens in a new tab)

  3. The relationship between procurment duration and design-build success in transportation projects

    … duration and Design-Build project success. Schedule growth, cost growth and total project time growth are used to measure project success in this paper. Linear regression analysis is used to analyze the relationship between procurement duration and each of the three project success factors. …

    unm Repository record for The relationship between procurment duration and design-build success in transportation projects (opens in a new tab)

  4. The relationship between alternative project approaches, integration, and performance

    … projects offer significant advantages in cost growth, schedule growth, modifications, and design deficiencies.

    uiuc Repository record for The relationship between alternative project approaches, integration, and performance (opens in a new tab)

  5. Empirical Analysis of Issue Management in Small Vertical Construction Projects: Relationship between Project Performance, Project Team Actions, and Issue Types

    … (mostly negative) from their base cost, schedule, and quality. Therefore, even smaller magnitude of cost and schedule growth on projects, can quickly cumulate to millions of dollars and months of schedule delay across the entire portfolio. Project control techniques can be used reduce the …

    ku Repository record for Empirical Analysis of Issue Management in Small Vertical Construction Projects: Relationship between Project Performance, Project Team Actions, and Issue Types (opens in a new tab)

  6. Relationship between procurement duration and project performance in design-build water/wastewater projects

    … project success criteria was defined as cost and schedule growth, which were objective measurements and thus provided more convincing data analysis. Project data was collected through an on-line questionnaire given to owners and design-builders who had experience in DB WW projects. The data was …

    unm Repository record for Relationship between procurement duration and project performance in design-build water/wastewater projects (opens in a new tab)

  7. An examination of the patterns of failure in defense acquisition programs

    … of behavior led to measurable cost and/or schedule growth if they were present in the respondent's program. Third, the postulated root causes for the behaviors were compared to the common themes from acquisition reform activities to determine alignment. Finally, the survey results were …

    mit Repository record for An examination of the patterns of failure in defense acquisition programs (opens in a new tab)

  8. Characterizing uncertainty to manage risk in spacecraft development with application to structures and mass

    … space programs experience significant cost and schedule growth over the course of program development. Poor uncertainty management has been identified as one of the leading causes of program cost and schedule overruns. Traditional methods of uncertainty management are deterministic, using …

    mit Repository record for Characterizing uncertainty to manage risk in spacecraft development with application to structures and mass (opens in a new tab)

  9. Application of the systems approach to defining major projects for successful implementation

    … loss of functionality with related cost and schedule growth, and sometimes outright cancellation. Research has shown that major contributors to these problems are systematic and can be associated with project size, complexity, technical uncertainty, schedule duration and urgency, physical and …

    city-london Repository record for Application of the systems approach to defining major projects for successful implementation (opens in a new tab)