Use of Team Building on Construction Projects to Reduce Cost Growth and Schedule Growth
… provided the foundation for this research. Cost growth and schedule growth are two areas that were suspected to be improved by the use of team building. A thorough statistical and graphical analysis was conducted to evaluate the effects of the team building process on cost growth and schedule …
-
Investigating the relationships of project performance measures with the use of Building Information Modeling (BIM) and Integrated Project Delivery (IPD)
… IPD experienced significantly less cost and schedule growth; what's more, projects that used BIM in construction were found to exhibit significantly higher levels of schedule growth. Lastly, healthcare projects using IPD had significantly fewer Requests for Information (RFI) at the 90% CL. A …
-
The relationship between procurment duration and design-build success in transportation projects
… duration and Design-Build project success. Schedule growth, cost growth and total project time growth are used to measure project success in this paper. Linear regression analysis is used to analyze the relationship between procurement duration and each of the three project success factors. …
-
The relationship between alternative project approaches, integration, and performance
… projects offer significant advantages in cost growth, schedule growth, modifications, and design deficiencies.
-
Empirical Analysis of Issue Management in Small Vertical Construction Projects: Relationship between Project Performance, Project Team Actions, and Issue Types
… (mostly negative) from their base cost, schedule, and quality. Therefore, even smaller magnitude of cost and schedule growth on projects, can quickly cumulate to millions of dollars and months of schedule delay across the entire portfolio. Project control techniques can be used reduce the …
-
Relationship between procurement duration and project performance in design-build water/wastewater projects
… project success criteria was defined as cost and schedule growth, which were objective measurements and thus provided more convincing data analysis. Project data was collected through an on-line questionnaire given to owners and design-builders who had experience in DB WW projects. The data was …
-
An examination of the patterns of failure in defense acquisition programs
… of behavior led to measurable cost and/or schedule growth if they were present in the respondent's program. Third, the postulated root causes for the behaviors were compared to the common themes from acquisition reform activities to determine alignment. Finally, the survey results were …
-
Characterizing uncertainty to manage risk in spacecraft development with application to structures and mass
… space programs experience significant cost and schedule growth over the course of program development. Poor uncertainty management has been identified as one of the leading causes of program cost and schedule overruns. Traditional methods of uncertainty management are deterministic, using …
-
Application of the systems approach to defining major projects for successful implementation
… loss of functionality with related cost and schedule growth, and sometimes outright cancellation. Research has shown that major contributors to these problems are systematic and can be associated with project size, complexity, technical uncertainty, schedule duration and urgency, physical and …
-
Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries : a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project’s schedule (PPP vs. traditional projects)
… growing population and the targeted economic growth in these countries. Accordingly resorting to the PPP scheme is a way for the governmental authorities to achieve the objectives of better services to the end user in energy, educational, water and wastewater, and transportation projects with …