Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 2 of 2 for “"Schedule Acceleration"”.
-
Scoping Operational Readiness and Investigating Its Financial Impact in Capital Projects: A Study of the South African Platinum Mining Sector
… experience inefficiencies, cost escalation, and schedule overrun. A scoping literature review (SLR) was conducted to define and contextualise OR, identify its scope and core components, and assess its relationship with project handover performance and financial outcomes. The SLR findings were …
-
Multi-objective optimization for resource driven scheduling in construction projects
… to (1) provide efficient resource utilization schedules that are capable of directly measuring and minimizing the negative impacts of resource fluctuations in construction projects; (2) analyze and optimize the impact of schedule acceleration strategies such as the utilization of multiple …