Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 1 of 1 for “"Risk-Based Failure"”.

  1. Optimising Turnaround Maintenance (TAM) Scheduling of Gas plants in Libya

    … of Equipment (CSEs) that constitute the highest risk based on Risk-Based Inspection (RBI). Third stage; selecting Critical Rotating pieces of Equipment (CREs) that constitute the highest risk based on Risk-Based Failure (RBF). Fourth stage; defining the optimum duration and interval of TAM based

    bradford Repository record for Optimising Turnaround Maintenance (TAM) Scheduling of Gas plants in Libya (opens in a new tab)