Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 3 of 3 for “"Resource-Driven Scheduling"”.

  1. Multi-objective optimization for resource driven scheduling in construction projects

    … many capabilities and contributions of available resource-driven scheduling techniques and models, they still suffer from a number of important limitations including their inability to (1) provide efficient resource utilization schedules that are capable of directly measuring and minimizing the …

    uiuc Repository record for Multi-objective optimization for resource driven scheduling in construction projects (opens in a new tab)

  2. Optimized scheduling for repetitive construction projects

    … object-oriented model is presented for optimized scheduling of repetitive construction projects such as: high-rise buildings, housing projects, highways, pipeline networks, bridges and tunnels. The model provides a number of practical features, and incorporates newly developed algorithms for …

    concordia Repository record for Optimized scheduling for repetitive construction projects (opens in a new tab)

  3. Optimal scheduling and resource utilization for repetitive construction projects

    … project, moving from one location to the next. Scheduling this type of projects often requires maximizing work continuity for these crews while reducing the project duration and the use of overtime. The main goal of this study is to present the development of novel models for optimizing the …

    uiuc Repository record for Optimal scheduling and resource utilization for repetitive construction projects (opens in a new tab)