Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 5 of 5 for “"Quantity take-off"”.

  1. A Framework for BIM Model-Based Construction Cost Estimation

    <p>This thesis presents a framework to conduct a quantity take-off (QTO) and cost estimate within the Building Information Modeling (BIM) Environment. The product of this framework is a model-based cost estimating tool. The framework addresses the cost uncertainty associated with the detailed …

    calpoly Repository record for A Framework for BIM Model-Based Construction Cost Estimation (opens in a new tab)

  2. A framework to enhance the adoption of building information modelling amongst Sri Lankan quantity surveying organisations to increase the accuracy of pre-tender cost estimates

    … As a result, several studies have been undertaken to investigate the causes of cost overruns and found that inaccurate project cost estimates are a major reason for project cost overruns. Conventional tasks, such as manual quantity take-off, the use of 2D drawings, and a lack of information …

    salford Repository record for A framework to enhance the adoption of building information modelling amongst Sri Lankan quantity surveying organisations to increase the accuracy of pre-tender cost estimates (opens in a new tab)

  3. A Knowledge-based system framework for semantic enrichment and automated detailed design in the AEC projects

    … projects’ lifecycle will provide the project stakeholders with the rich information embedded in the parametric design models. Users can incorporate this rich information in various activities, improving efficiency and productivity of project activities and potentially enhancing accuracy and …

    gatech Repository record for A Knowledge-based system framework for semantic enrichment and automated detailed design in the AEC projects (opens in a new tab)

  4. Minimising embodied carbon in buildings: Uncertainty during early-stage design

    … ECC database. The thesis later integrates quantity uncertainty by design stage with material ECC uncertainty for early-stage structural EC assessments, capturing incompleteness and variation due to quantity take-off methods and early-stage estimations. Additionally, the thesis introduces a …

    cambridge Repository record for Minimising embodied carbon in buildings: Uncertainty during early-stage design (opens in a new tab)