Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 11 of 11 for “"Project delivery method"”.

  1. Development of Fuzzy Hybrid Approaches to Project Delivery Method Selection in Highway Construction

    Selection of project delivery methods is a success factor in delivering highway construction projects because it has a substantial impact on the project performance, such as cost, time, and quality. Project delivery decision-making processes have been heavily relied on experts’ opinions and …

    ku Repository record for Development of Fuzzy Hybrid Approaches to Project Delivery Method Selection in Highway Construction (opens in a new tab)

  2. Evaluating the effectiveness of design-build project delivery method in commercial interior design and fit-out projects. A qualitative study of New Zealand’s AEC industry

    … for commercial interior design and fit-out projects has been increasing steadily, with the Architectural, Engineering, and Construction (AEC) industry paying more attention to this area due to the demand for commercial sectors such as offices, retail, and hospitality. Limited research is …

    otago-polytech Repository record for Evaluating the effectiveness of design-build project delivery method in commercial interior design and fit-out projects. A qualitative study of New Zealand’s AEC industry (opens in a new tab)

  3. Investigation into the effects of project delivery methods on LEED targets

    … and evaluation of green buildings. The project delivery method, chosen by the owner, can affect the achievement of project targets (e.g., budget, schedule, LEED certification). The most utilized project delivery method is the traditional Design-Bid-Build (DBB). Integrated Project

    usfca Repository record for Investigation into the effects of project delivery methods on LEED targets (opens in a new tab)

  4. Evaluation of building information modelling (BIM) adoption, capability and maturity within South African consulting and construction firms

    … of contractors and consultants on construction projects whilst firms in the industry battle for survival. In order to survive in the highly competitive construction market, firms within the industry, need a paradigm shift. To move from traditional project delivery methodologies which continue to …

    cape-town Repository record for Evaluation of building information modelling (BIM) adoption, capability and maturity within South African consulting and construction firms (opens in a new tab)

  5. Strategy for penetrating engineering & construction markets in Southeast Asia for Singapore through BOT contract

    … Singapore to use Build-Operate-Transfer (BOT) project delivery method to not only capture a solid share in the privatization market, but also secure a long-term demand for its engineering & construction services, and facilitate the city-state's dependence on manufacturing and trading. The goal …

    mit Repository record for Strategy for penetrating engineering & construction markets in Southeast Asia for Singapore through BOT contract (opens in a new tab)

  6. Measuring Sustainability: Why and How Public-Private Partnerships Achieve Envision's Platinum Verification

    … partnerships (P3) are outperforming other delivery methods in their ability to meet sustainability objectives. The main driver for decisions in any project has been seen as linked to a cost analysis. This research aims to determine why and how P3 projects are more likely to implement more …

    vt Repository record for Measuring Sustainability: Why and How Public-Private Partnerships Achieve Envision's Platinum Verification (opens in a new tab)

  7. Understanding the issues of project cost and time in sustainable construction from a general contractor's perspective: case study

    … delivering successful sustainable construction projects. If an integrated project delivery method is chosen, the General Contractor may offer insightful preconstruction assistance by providing ideas on green construction methods and materials. As sustainable building practices become more …

    gatech Repository record for Understanding the issues of project cost and time in sustainable construction from a general contractor's perspective: case study (opens in a new tab)

  8. Public Sector Infrastructure Delivery Through Public Private Partnerships in Zambia

    … embraced Public Private Partnerships (PPPs) as a project delivery method. The country faces budgetary constraints which have made maintenance and provision of new infrastructure a challenge. PPPs seem to create opportunities which can stimulate investment in infrastructure development and economic …

    zambia Repository record for Public Sector Infrastructure Delivery Through Public Private Partnerships in Zambia (opens in a new tab)

  9. Assessing the rise of Design-Build-Finance Delivery in Transportation Infrastructure

    While other alternative project delivery methods have emerged to address the limitations of Design-Bid-Build, Design-Build-Finance (DBF) has surfaced more recently. Although DBF has gained prominence in the past decade, research pertaining to this method is limited. Consequently, this research …

    vt Repository record for Assessing the rise of Design-Build-Finance Delivery in Transportation Infrastructure (opens in a new tab)

  10. A study of the role of the manufacturing sector in Zambia’s economic growth – a quantitative approach.

    … 2030 making it a middle-income nation as a project delivery method. The country faces constraints that have made this provision a challenge. The Manufacturing sector plays a role in contributing to this challenge. The purpose of this study was to understand the contribution of each sector …

    zambia Repository record for A study of the role of the manufacturing sector in Zambia’s economic growth – a quantitative approach. (opens in a new tab)