Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 22 for “"Production schedules"”.

  1. The Benefit of Using Simulation to Improve The Implementation of Lean Manufacturing Case Study: Quick Changeovers to Allow Level Loading of The Assembly Line

    … case study of implementing level loading of the production schedule for BullFrog International, L.C. will be examined. To make it possible to implement level loading, the thermo-former machine at the beginning of the operations was improved to allow quick changeovers. The changeover time was …

    byu Repository record for The Benefit of Using Simulation to Improve The Implementation of Lean Manufacturing Case Study: Quick Changeovers to Allow Level Loading of The Assembly Line (opens in a new tab)

  2. Modeling drug substance purification manufacturing through schedule optimization and simulation

    … manufacturing environment. Purification production overtime (20%) is a big cost driver at Building XX1 (BXX). Current production planning and labor resource evaluation methods at BXX Purification are manual, do not capture schedule delays, and do not adequately account for labor …

    mit Repository record for Modeling drug substance purification manufacturing through schedule optimization and simulation (opens in a new tab)

  3. Long-term scheduling in underground coal mining using mixed binary programming

    … has been developed as an aid for generating production schedules which maximize the associated net present value. Defining the mine layout as a precedence network, with the nodes representing mining blocks, a solution procedure is developed, based on Benders' partitioning scheme. That is, the …

    vt Repository record for Long-term scheduling in underground coal mining using mixed binary programming (opens in a new tab)

  4. Minimizing machine set-up time when manufacturing printed circuit boards.

    … expensive component placement machines for the production of Printed Circuit Boards (PCBs). However, when these fast machines have to assemble small volumes of many different types of circuit boards, the machine set-up time becomes much more important than the assembly rate of each board. In …

    ottawa-retro Repository record for Minimizing machine set-up time when manufacturing printed circuit boards. (opens in a new tab)

  5. The production planning and inventory management of finished goods for a pharmaceutical company

    … of lean in TCG, it has implemented the TCG Production System which finds its roots in the famous Toyota Production System. The recognition of the importance of reducing the waste of inventory by TCG is the main motivational force for this internship. This thesis documents the inventory …

    mit Repository record for The production planning and inventory management of finished goods for a pharmaceutical company (opens in a new tab)

  6. Lean manufacturing in a mass customization plant : inventory correction and shortage measurement

    … products are highly customizable, and the production schedules change daily to comply with customer requests. In situations where variability - whether in product features or logistics - is high, lean implementation is difficult. Nonetheless, use of lean manufacturing techniques like Value …

    mit Repository record for Lean manufacturing in a mass customization plant : inventory correction and shortage measurement (opens in a new tab)

  7. Fuzzy logic-based fault diagnosis for mining equipment failures

    … breakdowns are not only expensive in terms of production losses but also important in meeting production schedules. In a complex piece of machinery like a shearer or a powered support system in a highly automated longwall face, such breakdowns can be due to one of the large number of possible …

    vt Repository record for Fuzzy logic-based fault diagnosis for mining equipment failures (opens in a new tab)

  8. Lean manufacturing in a mass customization plant : improvement of Kanban policy and implementation

    … The products are customizable, and the production schedules change from day to day to comply with customer requests. In situations where variability - whether in product features or logistics, use of lean manufacturing techniques like Value Stream Mapping and Waste Elimination helped to …

    mit Repository record for Lean manufacturing in a mass customization plant : improvement of Kanban policy and implementation (opens in a new tab)

  9. Extension of EOQ model with emergency orders and explicit energy cost considerations

    … the effect on inventory ordering policies for production systems with constant production rates but small, underlying possibilities for undesirable circumstances to threaten the production schedules. Rather than fulfilling any emergency demand with a more expensive and energy cost sensitive …

    missouri Repository record for Extension of EOQ model with emergency orders and explicit energy cost considerations (opens in a new tab)

  10. Developing root locus stability diagrams using a personal computer

    … Suppliers are trimming time from design and production schedules wherever possible in order to compete in the world market. It is for these, and other reasons that computer aided stability analysis is so important. The object is to ensure a safe and stable system and yet minimize the time …

    vt Repository record for Developing root locus stability diagrams using a personal computer (opens in a new tab)

  11. Mejora de los procesos de ensamble de la fábrica de congeladoras de la empresa BSH Electrodomésticos

    The purpose of this research is to improve the production processes of the two main areas in the horizontal chest freezer factory of the company BSH Electrodomesticos, taking as a starting point a current analysis of the company, identifying points for improvement, and providing solutions that are …

    lima Repository record for Mejora de los procesos de ensamble de la fábrica de congeladoras de la empresa BSH Electrodomésticos (opens in a new tab)

  12. Pre-Consumer Food Waste at Three Dining Facilities

    … to assess the amount (weight) of pre-consumer (production) food waste at a large university, serving 18,000 meal plan holders, and identify major contributors of food waste (i.e. food categories, types of waste). Dining facility managers and waste coordinators (WCs) were voluntarily recruited …

    vt Repository record for Pre-Consumer Food Waste at Three Dining Facilities (opens in a new tab)

  13. An Analysis of Labor Turnover in a Georgia Paper Company

    … training competent workers and disruptions in schedules which are caused by inadequate labor supplies. Disruptions in production schedules appear when a manager finds that he is short-handed because of labor turnovers. Disruptions in scheduling, cost industry money and this unnecessary cost can …

    gsu Repository record for An Analysis of Labor Turnover in a Georgia Paper Company (opens in a new tab)

  14. An algorithm to determine the causes of inventory stock-outs in manufacturing firms

    … shorter cycle times, and more closely integrated production schedules have led to an extremely low tolerance for inventory stock-outs. In such an environment, any shortage is costly, and understanding why stock-outs occur and how to prevent them is an important issue. However, the answer to the …

    mit Repository record for An algorithm to determine the causes of inventory stock-outs in manufacturing firms (opens in a new tab)

  15. Improving and maintaining the operational efficiency of a semiconductor equipment manufacturing warehouse

    … effects of the late part delivery are delayed production schedules and in the worst case scenario, a missed shipment to the customer, which is very costly. In order to improve the efficiency of the warehouse so as to consistently deliver parts on time, the picking efficiency needs to be …

    mit Repository record for Improving and maintaining the operational efficiency of a semiconductor equipment manufacturing warehouse (opens in a new tab)

  16. High Velocity Supply Chain: Redesigning a Long Lead Time, Short Shelf Life Supply Chain

    … stockout events every year adversely impact production schedules. This project addresses these problems by imagining inventory as a control loop problem, where we take the system from its current form as an "open" loop and convert it to a self-correcting "closed" loop. We do this by first …

    mit Repository record for High Velocity Supply Chain: Redesigning a Long Lead Time, Short Shelf Life Supply Chain (opens in a new tab)

  17. Comparison of Scheduling Algorithms for a Multi-Product Batch-Chemical Plant with a Generalized Serial Network

    … methodologies developed for batch-chemical production are seldom applied in industry (Musier & Evans 1989 and Grossmann et al. 1992). Scheduling decisions may have significant impact on overall company profitability by defining how capital is utilized, the operating costs required, and the …

    vt Repository record for Comparison of Scheduling Algorithms for a Multi-Product Batch-Chemical Plant with a Generalized Serial Network (opens in a new tab)

  18. Simulation of Energy Savings in Automotive Coatings Processes

    … user acts on a calendar, scheduling a year of production, and the model predicts the energy consumption of the paint shop. Five scenarios were run to test different conditions and the influence of scheduling on the energy consumption. Two different sets of production schedules have been …

    windsor Repository record for Simulation of Energy Savings in Automotive Coatings Processes (opens in a new tab)

  19. Co-optimization of Energy and Interruptible Load Reserve for a Strategic Major Consumer of Electricity

    … who are required to achieve a total production level over a short- or long-term time horizon and can shift consumption of electricity by utilizing flexibility in their production schedules. Finally, we demonstrate implementation of our single- and multi-stage models for a large …

    auckland-ms Repository record for Co-optimization of Energy and Interruptible Load Reserve for a Strategic Major Consumer of Electricity (opens in a new tab)

Page 1 of 2