Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 3 of 3 for “"On site Productivity"”.

  1. A productivity audit system for construction management in Indonesia

    … system (a diagnostic and advisory system) for construction productivity improvement in the Indonesian construction industry. The development of the productivity audit system covered five stages: 1 identification of the characteristics of the construction industry in the country through …

    wlv Repository record for A productivity audit system for construction management in Indonesia (opens in a new tab)

  2. Potential of temporal and spatial analysis techniques as tools for exploring changes in forest site productivity and following environmental interactions : Finnish-German comparative study

    The main target of this study is the detection of possible changes in forest site productivity and interaction with changes in the environmental conditions by the use of temporal and spatial analysis techniques. Height and radial increments of Norway spruce (Picea abies L. Karst) and Scots pine …

    freiburg-diss Repository record for Potential of temporal and spatial analysis techniques as tools for exploring changes in forest site productivity and following environmental interactions : Finnish-German comparative study (opens in a new tab)

  3. Propuesta de flujos de trabajo en encofrados metálicos horizontales utilizando first run study, para mejorar la productividad en obras fast track - retail en Lima Metropolitana

    … Carta Balance. Analizando inicialmente la razón donde se originan los retrasos de obra para este tipo de edificaciones, se ejecutan encuestas a Ingenieros y obreros de producción, que delimitan la investigación hacia la actividad de encofrados y desencofrados metálicos de elementos horizontales. …

    upc-peru Repository record for Propuesta de flujos de trabajo en encofrados metálicos horizontales utilizando first run study, para mejorar la productividad en obras fast track - retail en Lima Metropolitana (opens in a new tab)