Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 17 of 17 for “"Integrated Project Delivery"”.

  1. Integrated project delivery: a normative model for value creation in complex military medical projects

    Integrated Project Delivery (IPD) is a collaborative project delivery process that reduces waste and maximizes value creation by harnessing the expertise and experience of all relevant stakeholders throughout the design and construction process of a given project. The owner, designer, builder, and …

    uiuc Repository record for Integrated project delivery: a normative model for value creation in complex military medical projects (opens in a new tab)

  2. Multi-Criteria Decision Modeling for Best Value Selections in Target Value Design Integrated Project Delivery

    <p>Integrated Project Delivery (IPD) combined with Target Value Design (TVD) is a better way to deliver value for the client than traditional guaranteed maximum price (GMP) methods. With traditional GMP delivery methods, the interests of the parties are often at odds. The goal of IPD is to align …

    calpoly Repository record for Multi-Criteria Decision Modeling for Best Value Selections in Target Value Design Integrated Project Delivery (opens in a new tab)

  3. Case-based Study and Analysis of Integrated Project Delivery (IPD) Approach and Trust-Building Attributes

    … elements that distinguish IPD from a traditional delivery approach, to analyze how trust-based relationships are established and promoted, and to demonstrate if/how trust and IPD contractual principles correlate. The result of this research will promote the understanding of the industry on the …

    vt Repository record for Case-based Study and Analysis of Integrated Project Delivery (IPD) Approach and Trust-Building Attributes (opens in a new tab)

  4. Investigating the relationships of project performance measures with the use of Building Information Modeling (BIM) and Integrated Project Delivery (IPD)

    <p>The relationships of project performance with the use of Building Information Modeling (BIM) and Integrated Project Delivery (IPD) in the construction industry have not been decisively investigated. The potential effect of the technology and strategy on industry operations underscores the need …

    emich Repository record for Investigating the relationships of project performance measures with the use of Building Information Modeling (BIM) and Integrated Project Delivery (IPD) (opens in a new tab)

  5. BIM and Communication: Implementation of Building Information Modeling Into an Integrated Project Delivery Contract to Encourage Project Teams to Communicate

    … IPD and their implementation into a building project contract. The Integrated Delivery Processes is comprised of a collaborative team of Designers, Constructors, and Owners working side by side to create a successful project. BIM has been introduced as a technology into the industry, as a tool …

    calpoly Repository record for BIM and Communication: Implementation of Building Information Modeling Into an Integrated Project Delivery Contract to Encourage Project Teams to Communicate (opens in a new tab)

  6. The impact of digitalisation on the management role of architectural technology.

    … either and some are already reaping them where project certainty is to the fore. However, the professional language that architects and engineers espouse is a latent force that can run counter to fostering collaboration. An emerging professional, the Architectural Technologist, can bridge that …

    rgu Repository record for The impact of digitalisation on the management role of architectural technology. (opens in a new tab)

  7. Understanding the issues of project cost and time in sustainable construction from a general contractor's perspective: case study

    … delivering successful sustainable construction projects. If an integrated project delivery method is chosen, the General Contractor may offer insightful preconstruction assistance by providing ideas on green construction methods and materials. As sustainable building practices become more …

    gatech Repository record for Understanding the issues of project cost and time in sustainable construction from a general contractor's perspective: case study (opens in a new tab)

  8. Exploratory Investigation into Influence of Educational Background on Tendency to Collaborate Among Owners, Architects, Engineers, and Contractors

    … may lead to an adversarial relationship among project stakeholders. Relatively low levels of productivity are pushing the construction industry to collaborate on a higher scale. With the introduction of Integrated Project Delivery (IPD) processes and new technologies, collaboration plays an …

    tdl Repository record for Exploratory Investigation into Influence of Educational Background on Tendency to Collaborate Among Owners, Architects, Engineers, and Contractors (opens in a new tab)

  9. Investigation into the effects of project delivery methods on LEED targets

    … and evaluation of green buildings. The project delivery method, chosen by the owner, can affect the achievement of project targets (e.g., budget, schedule, LEED certification). The most utilized project delivery method is the traditional Design-Bid-Build (DBB). Integrated Project

    usfca Repository record for Investigation into the effects of project delivery methods on LEED targets (opens in a new tab)

  10. Developing flexibility through alternative project delivery methods for the U.S. Army Corps of Engineers project management business process

    … reduce the likelihood that large infrastructure projects will be delivered on-schedule and on-budget. Divergence from entrenched project delivery methods can provide flexibility to project managers and offers advantages for improving quality, collaboration, costs, and timeliness. The objective of …

    mit Repository record for Developing flexibility through alternative project delivery methods for the U.S. Army Corps of Engineers project management business process (opens in a new tab)

  11. The relationship between procurment duration and design-build success in transportation projects

    … the design and construction of transportation projects. As a result, they are adopting more integrated process. Projects that previously used separate steps and parties may now be included in a single Design-Build system. When making a decision between a traditional Design-Bid-Build delivery

    unm Repository record for The relationship between procurment duration and design-build success in transportation projects (opens in a new tab)

  12. Tuning Up BIM for Safety Analysis

    … gaining attention with the emerging paradigm of Integrated Project Delivery which promotes collaboration between designers and constructors through the entire delivery process. With Design for Safety concepts, designers and constructors can work together to enhance construction workers' safety …

    vt Repository record for Tuning Up BIM for Safety Analysis (opens in a new tab)

  13. Development of a Pilot Study Simulation to Investigate the Impact of Target Costing on Team Dynamics and Design Aesthetics

    … forms an important fragment of the whole lean delivery system, Integrated Project Delivery. For the purpose of studying the team dynamics and the impact of cost on aesthetics, this research is split in to the following two parts. 1. Conducting simple experiments /simulations with students, such …

    tdl Repository record for Development of a Pilot Study Simulation to Investigate the Impact of Target Costing on Team Dynamics and Design Aesthetics (opens in a new tab)

  14. Analysis and Management of the Price Volatility in the Construction Industry

    … (ENR CCI), the methodology of the first paper is integrated with Value at Risk concept to cautiously estimate the escalation factor in both short and long-term construction projects for avoiding cost overrun due to price volatilities and inflation. Proposed methodology was also applied to two …

    lsu-thes Repository record for Analysis and Management of the Price Volatility in the Construction Industry (opens in a new tab)

  15. Comparative Analysis of Current Performance-Based Maintenance Methods to Improve Virginia Highways

    … maintenance milestones (i.e., 1st Design-Build project). The timeline linkages and collection of information on benefits associated with PBMC (compared to traditional method-based maintenance) were used to make five recommendations for VDOT\'s future maintenance program. VDOT recommendations …

    vt Repository record for Comparative Analysis of Current Performance-Based Maintenance Methods to Improve Virginia Highways (opens in a new tab)

  16. Application of the Design Structure Matrix (DSM) to the real estate development process using modular construction methods

    … idea into a real asset, by delivering a quality project on time and on budget. In recent years, Modular Construction Methods (MCM) has arisen as an innovative solution to commercial RED projects that require higher levels of the three aforementioned factors, with a special emphasis placed on …

    mit Repository record for Application of the Design Structure Matrix (DSM) to the real estate development process using modular construction methods (opens in a new tab)

  17. A framework for implementation of IPD principles in oil & gas projects

    … US$1 trillion. A high percentage of Oil & Gas projects go over budget, however, because of poor performance and major schedule delays. Many of these can be traced to problems originating in the design phase. This phase is typically carried out by experienced design consultants, followed by …

    salford Repository record for A framework for implementation of IPD principles in oil & gas projects (opens in a new tab)