Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 7 of 7 for “"INDUSTRIALISED BUILDING"”.
-
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
… and infrastructure. The government has adopted industrialised building systems (IBS) since the 1960s and has made significant efforts in this area. It aims to achieve several improvements within the industry, such as higher productivity levels and better quality construction products. The main …
-
Critical success factor model framework for lean management application in industrialised building system (IBS) production
In Malaysia, Industrialised Building System (IBS) has been recognised as a potential solution in improving the deliverables of construction projects. However, the acceptance of this modern technology is still low. Most of the construction players prefer the conventional construction method which …
-
Relationship of economies of scale (EOS) factors for Malaysian Industrialised building system (IBS) precast manufacturer
Industrialised Building System (IBS) or prefabrication has been identified as one of the key methods to reduce construction cost and gain financial benefits. The characteristic of controlled production and systematic process in the IBS manufacturing is helpful in quality production and profit …
-
Development of a Knowledge-Based Energy Damage for evaluating Industrialised Building Systems (IBS) Occupational Health and Safety (OHS) Risk
… of ‘off-site’ systems, commonly termed ‘industrialised building systems (IBS)’ in Malaysia, which require fewer workers on�site. This is deemed safer, based on the risk concept of reduced exposure; however, no method yet exists for determining the relative safety of various construction …
-
A comparative study of construction waste generation rate based on different construction methods used in construction projects in Malaysia
… the Mixed Construction Method (MCM) and the Industrialised Building System (IBS). The waste (tonnes) obtained from each construction method is divided by gross floor area (m2) to attain the Waste Generation Rate (WGR). Finally, the result of the study revealed that the WGRs for IBS, MCM and …
-
Development of a 3d bioprinting system, characterisation of bioink and printing microspheroids of hela cells
In Malaysia, Industrialised Building System (IBS) has been recognised as a potential solution in improving the deliverables of construction projects. However, the acceptance of this modern technology is still low. Most of the construction players prefer the conventional construction method which …
-
ΠΛΑΙΣΙΑ ΑΝΑΠΤΥΞΗΣ ΤΕΧΝΟΔΟΜΙΚΩΝ ΣΥΣΤΗΜΑΤΩΝ ΣΤΗ ΒΙΟΜΗΧΑΝΟΠΟΙΗΜΕΝΗ ΔΟΜΗΣΗ
Η ΔΙΑΤΡΙΒΗ ΔΙΑΡΘΡΩΝΕΤΑΙ ΣΕ 6 ΚΕΦΑΛΑΙΑ. ΣΤΟ 1 ΚΕΦΑΛΑΙΟ ΟΡΙΖΟΝΤΑΙ ΕΝΝΟΙΕΣ ΚΑΙ ΔΙΕΡΕΥΝΩΝΤΑΙ ΟΙ ΑΠΑΙΤΗΣΕΙΣ ΚΑΙ ΠΡΟΥΠΟΘΕΣΕΙΣ ΤΗΣ ΒΙΟΜΗΧΑΝΟΠΟΙΗΣΗΣ, ΠΡΟΣ ΤΟΝ ΣΧΕΔΙΑΣΜΟ ΚΑΙ ΤΗΝ ΠΑΡΑΓΩΓΗ ΤΟΥ ΚΤΙΡΙΟΔΟΜΙΚΟΥ ΕΡΓΟΥ ΚΑΙ ΤΩΝ ΚΑΤΑΣΚΕΥΑΣΤΙΚΩΝ ΜΕΡΩΝ ΤΟΥ, ΙΔΙΑΙΤΕΡΑ ΔΕ Η ΕΚΦΡΑΣΗ ΤΟΥΣ ΜΕΣΩ ΤΗΣ ΤΥΠΟΠΟΙΗΣΗΣ. ΣΤΟ 2 …