Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 1 of 1 for “"Freight rail crew scheduling"”.
-
Weekly crew scheduling for freight rail engineers : a network approach
Freight rail engineers and conductors have long faced unpredictable and inflexible work schedules, leading to on-the-job fatigue, compromised safety and poor work-life balance. This paper aims to design robust weekly schedules for these crew members to alleviate the pressures associated with …