Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 11 of 11 for “"Extension of time"”.
-
High Resolution Time-Limiter Schemes for Conservation Laws
This study investigates the high resolution time-limiter schemes for conservation laws. These schemes are proposed (K.Duraisamy, J.D.Baeder, J-G Liu, 2003) to enhance the stability of high order implicit time marching when the time step is beyond the original TVD limit. The improved stability is …
-
Risk assessment of time and cost overrun factors throughout construction project lifecycle
… important industry for the economic development of the country. However, this industry has been facing serious problems i.e. failure to complete projects within stipulated time and cost. Hence, the aim of this study is to assess the risk of various factors that cause time and cost overruns …
-
Digital frequency domain fluorometry and the study of Hoechst 33258 DYE-DNA interactions
"Fluorescence is a powerful tool for the study of chemical and biological processes. The typical decay times of fluorescence are ideal to study events in the pico to nanosecond range. On these time scales, the motions of many biological processes can be studied. The use of frequency domain …
-
Corporate Urbanization: Between the Future and Survival in Lebanon
<p>If you look today at the skyline of downtowns throughout the Middle East and beyond, the joint-stock corporation has transformed the urban landscape. The corporation makes itself present through the proliferation of its urban mega-projects, including skyscrapers, downtown developments and gated …
-
An investigation into the use of construction delay and disruption analysis methodologies
… and disruption (DD) to contractors’ progress, often resulting in time and cost overruns, are a major source of claims and disputes in the construction industry. At the heart of the matter in dispute is often the question of the extent of each contracting party’s responsibility for the delayed …
-
An evaluation of the implementation of the localized curriculum in selected primary schools in Mwansabombwe District, Zambia
… named localized curriculum, which makes up 20% of the curriculum. The purpose of the study is to evaluate implementation of the localized curriculum in selected primary schools in Mwansabombwe district of Zambia. The main research objectives where to: to find out challenges encountered in the …
-
An evaluation of the implementation of the localized curriculum in selected primary schools in Mwansabombwe District, Zambia
… named localized curriculum, which makes up 20% of the curriculum. The purpose of the study is to evaluate implementation of the localized curriculum in selected primary schools in Mwansabombwe district of Zambia. The main research objectives where to: to find out challenges encountered in the …
-
Revelation 6:9-11: An Exegesis of the Fifth Seal in the Light of the Problem of the Eschatological Delay
<p>The fifth seal of Revelation has most often been treated from an anthropological perspective that appears to be clearly inadequate to account for the depth of this trigger passage located in a climactic setting. In and around the fifth seal, the text suggests indeed that the persecution of the …
-
Enhancement of the United States extreme wind database and implications for extreme wind climatology
… in recent years to improve the characterization of extreme wind climatology in the contiguous United States, uncertainties still remain in its formal quantification. The importance of an accurate assessment of extreme wind climate is paramount, however, due to the outsized weight that the “basic …
-
Evaluation of the Factors Causing Cost and Time Overrun in the Namibian Construction Industry
Cost and time are one of the two primary parameters that require due considerations throughout the project lifecycle and are the determining factors for project success. However, it is very common that many projects fail to achieve their goal of being completed within the planned budget and …
-
Peran Kantor Urusan Agama (KUA) dan tokoh masyarakat dalam mencegah pernikahan dini di Desa Taman Sari Kecamatan Dringu Kabupaten Probolinggo
… village subdistrict Dringu Probolinggo are one of the areas that are still doing early marriage, but after the year 2003 to 2010 this phenomenon is wane. The problems in this study are the strategy and the obstacle of the Religious Affairs Office (KUA) and the community leaders in preventing …