Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 5 of 5 for “"Early contractor involvement"”.

  1. Early contractor involvement and the team approach

    Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Architecture, 1989.

    mit Repository record for Early contractor involvement and the team approach (opens in a new tab)

  2. Developing flexibility through alternative project delivery methods for the U.S. Army Corps of Engineers project management business process

    … with additional options in fast-tracking and early contractor involvement. Essentially, the flexibility of PMBP project delivery should match the vast diversity of USACE's missions.

    mit Repository record for Developing flexibility through alternative project delivery methods for the U.S. Army Corps of Engineers project management business process (opens in a new tab)

  3. Design and build procurement method in practice : key challenges and practice based enablers

    … delivery encompassing design and construction, early contractor involvement resulting in potential cost savings and earlier completion, easy constructability and minimisation of design and construction risk to clients.Despite its perceived increase in adoption over the last decade as supported …

    salford Repository record for Design and build procurement method in practice : key challenges and practice based enablers (opens in a new tab)

  4. A Framework for Construction-Driven Designs

    … the development of such designs requires the involvement of the key stakeholders such as contractor, major subcontractors and equipment vendors, and operations and maintenance personnel at the appropriate time in the design. This research presents the framework which addresses the key areas …

    vt Repository record for A Framework for Construction-Driven Designs (opens in a new tab)

  5. The development of 5D BIM framework to facilitate costing in contractor-led projects

    … Cost Protocol (5B-CP) as developed would allow contractors fully utilise BIM facilitating more effective 5D costing in a contractor-led project.

    wlv Repository record for The development of 5D BIM framework to facilitate costing in contractor-led projects (opens in a new tab)