Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 1 of 1 for “"Early Contractor Involvement (ECI)"”.

  1. The development of 5D BIM framework to facilitate costing in contractor-led projects

    … Cost Protocol (5B-CP) as developed would allow contractors fully utilise BIM facilitating more effective 5D costing in a contractor-led project.

    wlv Repository record for The development of 5D BIM framework to facilitate costing in contractor-led projects (opens in a new tab)