Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 4 of 4 for “"Cast-In-Place Deck"”.
-
Prestressed PCBT Girders Made Continuous and Composite with a Cast-in-place Deck and Diaphragm
… prestressed PCBT girders made composite with a cast-in-place concrete deck and continuous over several spans through the use of continuity diaphragms. The current design procedure in AASHTO states that a continuity diaphragm is considered to be fully effective if a compressive stress develops in …
-
Transverse Sub-Assemblage Testing of the Inverted-T Bridge System
The inverted-T bridge system is a rapid bridge construction technique that consists of precast inverted-T girders placed adjacent to one another and covered with a cast-in-place deck. This system was first implemented in the U.S. by the Minnesota Department of Transportation (Mn/DOT). This research …
-
Seismic modeling, analysis and design of structural concrete pile-deck connections
… of shallow embedment, structural concrete pile-deck connections: (i) the implementation and validation of a computational model that includes the resulting rotations due to slip of reinforcing dowels at the pile-deck interface, (ii) the evaluation of damage indices reported in the literature, …
-
Interface Shear Strength in Lightweight Concrete Bridge Girders
Precast girders and cast-in-place decks are a typical type of concrete bridge construction. A key part of this type of construction is developing composite action between the girder and deck. In order to develop composite action, adequate horizontal shear resistance must be provided at the …