Assembly lead time reduction in a semiconductor capital equipment plant through constraint based scheduling
… on design and space constraints. A preliminary build schedule was developed that prioritized critical path procedures. A trial of this build schedule achieved an assembly lead time of 39 hours, resulting in a 70% reduction from the current average of 5.5 days. This trial was also accomplished …
-
Modular Manufacture and Construction of Small Nuclear Power Generation Systems
… power plant projects are challenged by long build times and high construction costs, making them difficult to finance. Small Modular Reactors (SMRs) are nuclear reactors smaller than 300 MWe and claim to leverage manufacturing principles and modular build to resolve these issues and help …