Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 19 of 19 for “"Accelerated bridge construction"”.

  1. Guideline for Implementing Accelerated Bridge Construction in South Dakota

    … conducted to investigate the implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time and interruption to traffic. Less interruption to …

    sdstate Repository record for Guideline for Implementing Accelerated Bridge Construction in South Dakota (opens in a new tab)

  2. Categorizing Accelerated Bridge Construction Projects for Improving Decision-Making

    Accelerated Bridge Construction, also known as ABC, is a methodology that seeks to improve project development of bridges by reducing the overall project schedule and the impact on the traveling public by implementing innovative technologies and strategies in any phase of project development. …

    vt Repository record for Categorizing Accelerated Bridge Construction Projects for Improving Decision-Making (opens in a new tab)

  3. Seismic Performance of Bridge Column-Pile-Shaft Pin Connections for Application in Accelerated Bridge Construction

    Bridges with integral superstructures are common in high-seismic regions. The superstructure and substructure are connected using rigid connections in these bridges. However, hinge or "pin" connections may be used to connect columns to pile-shafts to reduce the overall force demand in the integral …

    unr Repository record for Seismic Performance of Bridge Column-Pile-Shaft Pin Connections for Application in Accelerated Bridge Construction (opens in a new tab)

  4. Development and optimization of ultra-high performance concrete using local materials

    Accelerated Bridge Construction (ABC) is a set of design principles that allow for the rapid construction of bridges. In accelerated bridge construction, a material known as ultra-high performance concrete (UHPC) is often used to join structural elements of the bridge together. While the material …

    gatech Repository record for Development and optimization of ultra-high performance concrete using local materials (opens in a new tab)

  5. Evaluating the Effects of Shored Construction on Steel Girder Composite Bridges

    <p>Steel composite girder bridges provide economic advantages and higher load-carrying capacity than non-composite alternatives. Over the years, a conventional sequence of un-shored construction for steel girder composite bridges has been developed. There is an alternative construction sequence, …

    embry-riddle Repository record for Evaluating the Effects of Shored Construction on Steel Girder Composite Bridges (opens in a new tab)

  6. Refinement of the Inverted T-Beam Bridge System for Virginia

    The inverted T-beam bridge system is a bridge construction technique that follows accelerated bridge construction processes. The system was discovered in France and first adopted in the U.S. by the Minnesota Department of Transportation. In 2012 the system was modified and adopted by Virginia, with …

    vt Repository record for Refinement of the Inverted T-Beam Bridge System for Virginia (opens in a new tab)

  7. VHPC Material Characterization and Recommendations for the Buffalo Branch Bridge Rehabilitation

    Adjacent box beam bridges are economical bridge systems for accelerated bridge construction. The box beams are constructed at precast plants and are traditionally connected by a shear key filled with grout. This system is ideal for short spans with low clearance restrictions. However, due to the …

    vt Repository record for VHPC Material Characterization and Recommendations for the Buffalo Branch Bridge Rehabilitation (opens in a new tab)

  8. Investigation of Concrete Mixtures to Reduce Differential Shrinkage Cracking in Inverted T Beam System

    The inverted T-beam system provides an accelerated bridge construction alternative. The system consists of adjacent precast inverted T-beams finished with a cast-in-place concrete topping. The system offers enhanced performance against reflective cracking and reduces the likelihood of cracking due …

    vt Repository record for Investigation of Concrete Mixtures to Reduce Differential Shrinkage Cracking in Inverted T Beam System (opens in a new tab)

  9. Enhanced cost estimation for ABC bridge project: Data collection, analysis, and integration

    Submission original under an indefinite embargo labeled 'Open Access'. The submission was exported from vireo on 2025-02-04 without embargo terms

    uiuc Repository record for Enhanced cost estimation for ABC bridge project: Data collection, analysis, and integration (opens in a new tab)

  10. Development of a Composite Concrete Bridge System for Short-to-Medium-Span Bridges

    The inverted T-beam bridge system provides an accelerated bridge construction alternative for short-to-medium-span bridges. The system consists of adjacent precast inverted T-beams finished with a cast-in-place concrete topping. The system offers enhanced performance against reflective cracking, …

    vt Repository record for Development of a Composite Concrete Bridge System for Short-to-Medium-Span Bridges (opens in a new tab)

  11. Rehabilitation of Longitudinal Joints in Double-Tee Girder Bridges

    <p>Prefabricated bridge elements have become an essential part of accelerated bridge construction (ABC), which is an emerging technology to expedite bridge construction. Among several bridge girder types, precast double-tee girders are common on county bridges in South Dakota because of the ease of …

    sdstate Repository record for Rehabilitation of Longitudinal Joints in Double-Tee Girder Bridges (opens in a new tab)

  12. Experimental Studies of Reinforcing Steel and Shape Memory Alloys in Mechanically Spliced Connections for Seismic Application

    … bar splices for use in the plastic hinge of a bridge column for use in accelerated bridge construction (ABC). The implementation of couplers in a plastic hinge for ABC is not unique, however coupler application has been limited to regions of low seismic hazard due to lack of knowledge about …

    unr Repository record for Experimental Studies of Reinforcing Steel and Shape Memory Alloys in Mechanically Spliced Connections for Seismic Application (opens in a new tab)

  13. Hooked Bar Anchorages and their Use in Noncontact Lap Splices

    … of large precast concrete elements typical of bridge substructure. Most importantly, lap splices of large (e.g., No. 11) straight bars are substantially long. Since the closure joint connecting two precast elements must be at least long enough to fit the lap splice, traditional lap splices …

    vt Repository record for Hooked Bar Anchorages and their Use in Noncontact Lap Splices (opens in a new tab)

  14. Recommendations for Surface Treatment for Virginia Inverted T-Beam Bridge System

    … methods for use in the Virginia Inverted T-Beam bridge system. The specific system consists of precast beams with thin bottom flanges placed next to one another, with a cast-in-place slab on top. Previous research has shown that the strength of this system after cyclic loading is highly dependent …

    vt Repository record for Recommendations for Surface Treatment for Virginia Inverted T-Beam Bridge System (opens in a new tab)

  15. Behavior of hollow-core fiber reinforced polymer-concrete-steel bridge columns under extreme loading

    … fiber reinforced polymer-concrete-steel (HC-FCS) bridge columns under extreme loading. The HC-FCS column consists of a concrete wall sandwiched between an outer fiber reinforced polymer (FRP) tube and an inner steel tube. The steel tube was embedded into a reinforced concrete footing with an …

    must-thes Repository record for Behavior of hollow-core fiber reinforced polymer-concrete-steel bridge columns under extreme loading (opens in a new tab)

  16. Transverse Sub-Assemblage Testing of the Inverted-T Bridge System

    The inverted-T bridge system is a rapid bridge construction technique that consists of precast inverted-T girders placed adjacent to one another and covered with a cast-in-place deck. This system was first implemented in the U.S. by the Minnesota Department of Transportation (Mn/DOT). This research …

    vt Repository record for Transverse Sub-Assemblage Testing of the Inverted-T Bridge System (opens in a new tab)

  17. Precast Full-Depth Deck Panels Supported on Inverted Bulb-Tee Bridge Girders

    … (SDDOT) currently uses precast double-tee bridge deck systems for many of its county bridges because they are economical and fast in construction. Current bridges are designed for a service life of 75 years. However, many double-tee girder bridges are deteriorating and some need total …

    sdstate Repository record for Precast Full-Depth Deck Panels Supported on Inverted Bulb-Tee Bridge Girders (opens in a new tab)