Back to search

Virginia Polytechnic Institute and State University

Project selection and timing integrating project deferral, cash flow transferals, financing and investment functions

Abstract

dc:description.abstract

The success of a firm depends on the overall performance of all projects undertaken, whether they are production, sales, maintenance, or other types of projects. Correctly choosing promising projects becomes one of the most significant prerequisites for the success of the firm. The"correct" decision, in this research, is identified as the selection of the right projects at the right time. While there are various restrictions that limit the selection decision, this study focuses on situations in which the funds available to the candidate projects are limited. Unlike typical project selection problems, which assume that the disposable capital all comes from the specified budget, this research considers four additional methods to increase the funds available for the projects. They are project deferral, cash flow transferals, financing, and investment functions. The purpose is to increase the firm's wealth by selecting worthy projects which would otherwise be rejected. To make the right selection under this new situation, a modified version of Weingartner' s 0-1 integer programming model is developed. By introducing artificial variables, the modified model can be maintained in a linear programming (LP) form (mixed integer). The advantage of the formulation is that, the relatively convenient LP software package can be used to manipulate the tedious calculations and then derive the optimal answer. No new solution techniques are necessary. The revised model is developed under an imperfect capital market condition in which an n-step function is used to describe the dependency between the cost of capital and capital supplied. The workings of the revised model are illustrated by numerical examples. Future research topics, including the uncertainty consideration, are recommended at the end of this thesis.

Degree

thesis:*
Name thesis:degree_name
M.S.
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Industrial Engineering and Operations Research
Department dc:contributor.department
Industrial Engineering and Operations Research
Grantor dc:publisher
Virginia Polytechnic Institute and State University
Year dc:date.issued
1986

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Her, Shin-Je

Rights

dc:rights
Statement dc:rights
  • In Copyright
Language dc:language.iso
en_US

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/10919/94454
OAI identifier oai:identifier
oai:vtechworks.lib.vt.edu:10919/94454

Chain of custody

source
Harvested from
Virginia Tech
Base URL
vtechworks.lib.vt.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Her, Shin-Je. Project selection and timing integrating project deferral, cash flow transferals, financing and investment functions. masters thesis, Virginia Polytechnic Institute and State University, 1986. http://hdl.handle.net/10919/94454