Back to search

Virginia Agricultural and Mechanical College and Polytechnic Institute

The study of boiler saline concentrations and a determination of a more efficient boiler blowdown procedure

Abstract

dc:description.abstract

The importance of the feedwater problem and the meager knowledge of existing feedwater conditions make it desirable to conduct a study of boiler salines at the V.P.I. power plant. A determination of the critical concentrations of the boiler salines at various loads was to be made and an optimum operating concentration established. An investigation was to be made to determine the difference, if any, between the boiler salines taken from the steam drum and the boiler salines taken from the mud drum. A more efficient feedwater system was to be investigated. The ultimate purpose is, obviously, to improve the efficiency with which the water is used at the V.P.I. power plant. Besides the aid that such a study will be to the operators of the V.P.I. power plant, it is possible that men operating similar units elsewhere will also benefit by the information found. 1. The average concentration of total solids in the raw water was found to be 221 ppm. The average concentration of total solids in the feedwater was found to be 86 ppm. These values should be used in calculating boiler blow-down. 2. For a load of 25,000 lb./hr., carryover starts at a concentration of 4,500 ppm. Keeler Co. states that no trouble should be encountered under normal operation with a concentration of 3,500 ppm. The No. 5 Boiler can be safely operated at a concentration of 2,500 ppm. total solids. The boiler will operate at a concentration of 5,500 ppm. total solids if the load is constant. 3. A straight line relationship exists between methyl orange alkalinity and total solids. This is shown in Fig. 5. This graph should be used in the plant to convert “M. O.” to total solids. 4. Neither pH nor specific gravity should be used to control boiler saline concentration. 5. If foaming troubles are to be avoided, a method of rust removal from the feedwater must be found. 6. Boiler No. 5 should not be abused. Normal operation should involve no sudden increase in load in excess of 3,000 lb./hr. 7. Under present operating conditions, the blow-down should be reduced. 8. The proposed change should be adopted.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Power and Fuel Engineering
Department dc:contributor.department
Power and Fuel Engineering
Grantor dc:publisher
Virginia Agricultural and Mechanical College and Polytechnic Institute
Year dc:date.issued
1941

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Silver, Walter Henry

Rights

dc:rights
Statement dc:rights
  • In Copyright
Language dc:language.iso
en_US

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/10919/53737
OAI identifier oai:identifier
oai:vtechworks.lib.vt.edu:10919/53737

Chain of custody

source
Harvested from
Virginia Tech
Base URL
vtechworks.lib.vt.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Silver, Walter Henry. The study of boiler saline concentrations and a determination of a more efficient boiler blowdown procedure. masters thesis, Virginia Agricultural and Mechanical College and Polytechnic Institute, 1941. http://hdl.handle.net/10919/53737