Back to search

Massachusetts Institute of Technology

Capacity challenges on the California high-speed rail shared corridors : how local decisions gave statewide impacts

Abstract

dc:description.abstract

In 2012, as a cost-control measure and in response to local opposition in the San Francisco Bay Area, the California High-Speed Rail Authority (CHSRA) adopted a "blended system" at the north and south bookends of the planned first phase of its high-speed rail line. In this blended operation, the high-speed rail line will share track and other infrastructure with commuter rail, intercity rail, and freight on the 50- mile Peninsula Corridor in Northern California and on 50 miles of right-of-way between Burbank, Los Angeles, and Anaheim in Southern California. This thesis provides a critical review of the blended system and discusses the level of cooperation and coordination necessary between host railroads and the high-speed rail tenant operator. In Northern California, the Peninsula Corridor Joint Powers Board's Caltrain commuter rail service between San Francisco and San Jose is experiencing record levels of ridership. This thesis explores the impact of both the electrification of the line and its extension into San Francisco's central business district on future ridership demand. With the California High-Speed Rail Authority competing spatially and temporally with Caltrain for access to high-revenue and high-cost infrastructure, we review different strategies for coordination and integration between the two agencies. In Southern California, the final form of the blended system is more nebulous than its northern counterpart. For the first few years of high-speed rail service, the Metrolink service operated by the Southern California Regional Rail Authority is expected to complement the high-speed rail system. However, since Metrolink operates on congested rail infrastructure, some of it owned by capacity-conscious freight railroads, there will exist the challenge of providing quality service and transfer opportunities for time-sensitive high-speed rail customers. The change to a blended system was a dramatic change of direction for the CHSRA; as a result, a new paradigm is needed for implementation of the system over the next 15 years. This thesis reviews the upcoming local design choices to be made on the local rail corridors and evaluates them from the perspective of the future statewide rail network. We find that the decisions made on the local blended corridor level will affect both the financial viability of the overall project and the quality of service experienced by customers across the entire California rail system.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Department of Civil and Environmental Engineering.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2015

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Levy, Samuel J. (Samuel Joseph)
Advisor dc:contributor.advisor
  • Joseph M. Sussman

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/99542
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/99542

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Levy, Samuel J. (Samuel Joseph). Capacity challenges on the California high-speed rail shared corridors : how local decisions gave statewide impacts. Massachusetts Institute of Technology, 2015. http://hdl.handle.net/1721.1/99542