Back to search

Massachusetts Institute of Technology

Analysis and reduction of excess inventory at a heavy equipment manufacturing facility

Abstract

dc:description.abstract

The research presented in this thesis explores two hypotheses focused on excess inventory at a heavy equipment manufacturing facility. The scope of the thesis includes inventory in the form of raw materials, purchased components, and work in process parts found at the facility and in the off-site storage warehouse. The first hypothesis proposes that excess inventory at the facility has several key root causes, and that their elimination drastically reduces the accumulation rate of excess inventory. The second hypothesis proposes that a basic material review process could be effective in identifying and reducing excess inventory at the facility in a six-month timeframe. The hypotheses were tested over a six-month period at a Caterpillar Global Mining facility. The first hypothesis was not confirmed. More than twenty root causes of excess inventory accumulation were identified and no evidence was discovered that would suggest that certain root causes are dominant. The second hypothesis was supported by the findings at the facility. The organization was able to formulate a basic material review process, apply the process to the facility's inventory, and reduce excess inventory by roughly 35% over a three-month time span.

Degree

thesis:*
Department dc:contributor.department
Leaders for Global Operations Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2013

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Romanov, Alexander, M.B.A. Massachusetts Institute of Technology
Advisor dc:contributor.advisor
  • Deborah J. Nightingale and Charles H. Fine.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/81016
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/81016

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Romanov, Alexander, M.B.A. Massachusetts Institute of Technology. Analysis and reduction of excess inventory at a heavy equipment manufacturing facility. Massachusetts Institute of Technology, 2013. http://hdl.handle.net/1721.1/81016