Back to search

Massachusetts Institute of Technology

Rapid deployment of oil-drilling tools utilizing distribution network and inventory strategies

Abstract

dc:description.abstract

DTS is an oil and gas services company that delivers drilling tools to six major customer districts in the continental U.S. After the tools are used at a rig, they are transported to the closest repair and maintenance (MTC) facility in either Colorado (CO) or Oklahoma (OK) where they are disassembled and reconditioned for use on a future job. The tools are modular and require custom assembly and programming, depending on the requirements of the well. On occasion, DTS receives urgent orders for drilling tools to replace failed tools or to cater to unexpected demand. These urgent orders are expected to be delivered to customer sites in less than 24 hours from when an order is received. DTS wants to analyze the supply chain impact of consolidating MTC activities to a single facility for operational efficiencies. The rationalization of MTC activities to the CO facility affects DTS's ability to deliver tools within 24 hours due to the longer transportation times to customer districts. How can this longer transportation time be mitigated? Our research shows that using the OK facility as a postponement and distribution hub allows DTS to continue servicing expedited orders within 24 hours and results in a 28% logistics cost savings over a direct shipment method. The postponement strategy entails staging reconditioned inventory at both the OK and CO facility where they can be configured for use within 4 hours of receiving an order. By simulating the movement of inventory around the closed inventory loop, we determined that the total number of tools in the network and the MTC capacity are two important levers of control that affect the availability of reconditioned inventory to service demand. We found that we were able to fulfill a target item fill rate by calculating capital inventory required using an "order up to" inventory policy and setting facility capacity at one standard deviation above average demand.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Engineering Systems Division.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2010

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Rahim, Ryan
Advisor dc:contributor.advisor
  • Stephen C. Graves.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/61185
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/61185

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Rahim, Ryan. Rapid deployment of oil-drilling tools utilizing distribution network and inventory strategies. Massachusetts Institute of Technology, 2010. http://hdl.handle.net/1721.1/61185