Massachusetts Institute of Technology
Smoothing of pipe system completion processes in a shipyard environment/
Abstract
dc:description.abstractDue to a number of different production issues, the manufacture of template pipes is often delayed. These delays hold up pipe system completion on board the ships in production and can delay payments from the Ministry of Defense. In order to improve the production of template pipes, a number of changes are recommended to the pipe production processes overall. These include improvements in production planning, along with changes in procurement and scheduling methods. These changes in production methods will result in more material available when it is needed and will therefore improve the manufacture of template pipes. Additionally, they will improve the overall availability of pipes when needed as well as reducing inventory of finished pipes and decreasing the amount of rework. A number of other recommendations to improve the overall pipe manufacture process are also identified, including changes in performance measures, production planning, and other potential areas of improvement.
Degree
thesis:*- Department dc:contributor.department
- Leaders for Manufacturing Program at MIT
- Grantor dc:publisher
- Massachusetts Institute of Technology
- Year dc:date.issued
- 2004
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Zojwalla, Shaheen J. (Shaheen Joyab), 1977-
- Advisor dc:contributor.advisor
-
- Thomas W. Eagar and Arnold Barnett.
Subjects
dc:subject × 3Rights
dc:rights- Statement dc:rights
-
- M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
- Licence dc:rights.uri
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/1721.1/44610
- OAI identifier oai:identifier
- oai:dspace.mit.edu:1721.1/44610