Back to search

Massachusetts Institute of Technology

Inventory management of steel plates at an oil rig construction company

Abstract

dc:description.abstract

Keppel Fels produces make-to-order oil exploration rigs for the global market. Each rig requires close to 6000 metric tons of steel in the course of its production. Optimal management of this steel is very critical in this line of business. However, in recent years, demand for these rigs has been increasing at a tremendous rate and previous steel management policies are fast becoming unable to cope with this surge of demand. The thesis first looks at characterizing the nature of the demand of steel plates in the company. This led to the identification of key factors of demand, resulting in a classification system of the steel plates according to their demand behavior. This system further led to the crafting of various policies to manage the risks involved in the procurement of the steel plates. We propose to use the newsboy model to minimize the inventory costs, subject to uncertain demand. The conclusion of the thesis presents the optimized steel plate procurement quantities for the company.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2006

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Tan, Chien Yung
Advisor dc:contributor.advisor
  • Stephen C. Graves and David Hardt.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/38287
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/38287

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Tan, Chien Yung. Inventory management of steel plates at an oil rig construction company. Massachusetts Institute of Technology, 2006. http://hdl.handle.net/1721.1/38287