Back to search

Massachusetts Institute of Technology

Optimizing the sequenced production schedule by managing the internal supply chain

Abstract

dc:description.abstract

Many manufacturing companies wrestle with managing in-house manufactured inventories especially in the climate of Just-in-Time (JIT) manufacturing and with constant pressure to reduce inventory levels. One popular self-managing approach to controlling inventory levels while being responsive to customer demand is implementing a 'Pull' system. A Pull system is one that takes production signals from the downstream process and is based on true customer demand. This is in contrast to a 'Push' system that takes the production signal from the upstream schedule. This thesis will explore inventory management strategies at 3WA Powertrain Operation (PTO) as they approach plant wide implementation of 'Pull-to-Assembly'. 3WA PTO is working to completely link each of their in-house component (parts) production processes to the scheduled Assembly process such that component production signals will each 'pull' from the following process step and ultimately from the Powertrain Assembly schedule. The tested hypotheses include: 1) For 'Pull-to-Assembly' to be successful, a highly synchronized and visible in-house inventory management structure must first be in-place.

Degree

thesis:*
Department dc:contributor.department
Leaders for Manufacturing Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2006

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Vessell, Aimee L
Advisor dc:contributor.advisor
  • Christopher L. Magee and Thomas A. Kochan.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/37236
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/37236

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Vessell, Aimee L. Optimizing the sequenced production schedule by managing the internal supply chain. Massachusetts Institute of Technology, 2006. http://hdl.handle.net/1721.1/37236