Back to search
Clemson University
Set up time Reduction and Quality Improvement on the Shop floor using different lean and quality tools
Degree
thesis:*- Name thesis:degree_name
- Master of Science (MS)
- Level thesis:degree_level
- Thesis
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Bavuluri, Seetha ram
- Contributors dc:contributor
-
- Mears, Laine M
- Mocko , Gregory M
- Li , Gang
Subjects
dc:subject × 1Identifiers
dc:identifier.*- Repository record dc:identifier
- https://open.clemson.edu/all_theses/1306
- OAI identifier oai:identifier
- oai:open.clemson.edu:all_theses-2306