Back to search

Department of Construction Economics and Management

An evaluation of the available methods of selecting a contractor, in order to satisfy the client's objectives, with a view to offering a systematic approach to which method should be adopted

Abstract

dc:description.abstract

Although the client's objectives of balancing cost, time and performance have not changed, the complexity of the design and construction of modern buildings today requires a thorough understanding of the factors affecting these objectives if they are to be accomplished. This study therefore begins by analysing the client's objectives to establish the factors affecting each objective and to determine the inter-relationship and possible conflict between these factors. The principal types of contracts and methods of selecting a contractor are then identified. The methods of selecting a contractor are then evaluated according to these factors and their effects on the client's objectives are established. This evaluation is then used as the basis for recommending a procedure to choose which method should be used to select a contractor, in order to accomplish the client's objectives, under differing circumstances.

Degree

thesis:*
Grantor dc:publisher.institution
Department of Construction Economics and Management
Year dc:date.issued
1986

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Stevenson, Colin
Advisor dc:contributor.advisor
  • Butt, P E

Rights

Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/11427/28247
OAI identifier oai:identifier
oai:open.uct.ac.za:11427/28247

Chain of custody

source
Harvested from
University of Cape Town
Base URL
open.uct.ac.za/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Stevenson, Colin. An evaluation of the available methods of selecting a contractor, in order to satisfy the client's objectives, with a view to offering a systematic approach to which method should be adopted. Department of Construction Economics and Management, 1986. http://hdl.handle.net/11427/28247